











|
This Week's Legal Notices:
NOTICE
OF PUBLIC HEARING
PANHANDLE WATER PLANNING GROUP
4-28-10 – AMARILLO, TEXAS
The Panhandle Water Planning Group (PWPG), a
Regional Water Planning Group formed pursuant to the requirements of
Senate Bill 1 (75th Legislative Session), will hold a Public Hearing on
April 28, 2010 at the Texas AgriLife Research and Extension Center at
Amarillo, 6500 Amarillo Boulevard West, Amarillo, Texas beginning at 6:00
PM, CST. The purpose of the
Public Hearing is to present to the public the results of the Initially
Prepared 2011 Regional Water Plan (IPP) for Region A, Panhandle Water
Planning Area, and to solicit input and comments from the general public
and interested parties and entities. Region
A comprises all of Dallam, Sherman, Hansford, Ochiltree, Lipscomb,
Hartley, Moore, Hutchinson, Roberts, Hemphill, Oldham, Potter, Carson,
Gray, Wheeler, Randall, Armstrong, Donley, Collingsworth, Hall, and
Childress Counties.
The Public Hearing will consist of
a presentation on the IPP, receipt of written and oral comments from the
public, and comments from the PWPG.
The IPP is currently available for
public review and inspection at www.panhandlewater.org and in the County
Clerk’s office in each of the Region A Counties listed above.
The IPP is also available in the following public libraries or
alternate locations: Dallam
County (Dalhart); Sherman County (Stratford); Hansford County (Spearman);
Perry Memorial (Perryton); Kilgore Memorial (Dumas); Hutchinson County
(Borger); Roberts County (Miami); Hemphill County (Canadian); Oldham
County (Vega); Potter County (Amarillo Downtown Library); Carson County
(Panhandle); Lovett Memorial (Pampa); Wheeler; Canyon; Claude; Clarendon;
Wellington; Memphis; Childress; and the offices of the Panhandle Regional
Planning Commission, 415 W. 8th Amarillo, TX.
For more information please
contact: Kyle G. Ingham, Local Government Services Director, PO Box 9257,
Amarillo, TX 79105; ph: (806) 372-3381; kingham@theprpc.org.
The PWPG will receive written and oral comments at the hearing and
will also receive written comments separate from the hearing.
Individuals wishing to submit written comments separate from the
hearing may address their comments to the PWPG, Attn: Kyle G. Ingham at
the above address. All written
comments submitted separate from the hearing must be received no later
than 5:00 PM, Monday June 28, 2010. All
comments received will be considered prior to final adoption of the 2011
Panhandle Regional Water Plan. 14-1tc
INVITATION
FOR BIDS
The City of Hedley, Texas, will receive bids for construction of water and
sewer system improvements until 2:00 p.m. on the 1st day of
April, 2010, in City Hall, 109 Main Street, Hedley, TX 79237, at which
time and place all bids received will be publicly opened and read aloud.
Bids are incited for the
construction of the following:
C900 Water Mains 3392
L.F.
SCH 40 Water Mains 1000
L.F.
SDR 35 Gravity Sewer 3442
L.F.
Directional Bore 300 L.F.
Contract documents, including
plans and specifications are available at the office of OJD Engineering,
Inc., 2420 Lakeview Drive, Amarillo, Texas 79109, Phone 806-352-7117, FAX
806-352-7188. Copies may be purchased at a cost of $75.00 per set. This
fee is not refundable. Questions concerning this project should be
addressed to Che Shadle, P.E., OJD Engineering, Inc, 2420 Lakeview Dr.,
Amarillo, Texas, 79109, Phone 806-352-7117, FAX 806-352-7188, or email –
che.shadle@ojdengineering.com.
A Bid Bond in the amount of 5% of
the bid, issued by an acceptable surety, shall be submitted with each bid.
A certified check or bank draft payable to the City of Hedley, or
negotioable U.S. Government Bonds (at par value) may be submitted in lieu
of the Bid Bond.
Attention is called to the fact
that not less than the federally determined prevailing (Davis-Bacon) wage
rate, as issued by the Texas Department of Commerce and contained in the
Contract Documents must be paid on the project. In addition, the
successful bidder must ensure that employees and applicants for employment
are not discriminated against because of their race, color, religion, sex
or national origin.
Attention is called to General
Condition 140, “Restrictions on Public Buildings and Public Works
Projects”. The Bidder certifies by the submission of its bid that it:
- Is
not a Contractor of a foreign country included on the USTR list.
- Has
not and will not enter into any subcontract with a subcontractor of a
foreign country included on the USTR list.
- Will
not provide any product of a foreign country included on the USTR
list.
The City of Hedley reserves the
right to reject any or all bids or to waive any informalities in the
bidding.
Bids may be held by the City of
Hedley for a period not to exceed sixty (60) days from the date of the bid
opening for the purpose of reviewing the bids and investigation the
bidders’ qualifications prior to awarding of the contract.
|
|